Showing posts with label Profesional Engineer. Show all posts
Showing posts with label Profesional Engineer. Show all posts

Saturday, November 28, 2015

Soalan rujukan utk exam PE (COE)

Assalam dan selamat malam,

Saya menerima banyak email dari sahabat yang memerlukan contoh jawapan untuk exam bertulis bagi menduduki PE exam. Disini saya lampirkan file yang boleh didownload terus. Saya tak dapat membalas email tuan/puan yang meminta contoh jawapan tersebut kerana banyak kerja pada waktu sekarang ini.

Lagi satu contoh untuk yang mintak standard format bagi experience summary, ingin saya nyatakan disini saya tak dapat nak bagi kerana format tersebut telah hilang semasa saya menggunakan laptop lama saya dulu. Contoh summary project boleh diminta dari mentor anda atau hubungi pihak IEM sendiri. Contoh jawapan standard yang saya attach kan disini adalah semasa saya amik exam pd tahun 2009 dulu. saya tak tahu sama ada ia berubah tau tidak. sekurang2 saya dpt membantu apa yang mampu sahaja. Good luck saya ucapkan, semoga berjaya...jangan lupa hanya doa sahaja yg dipinta agar saya sihat sentiasa dan murah rezeki...hehee, itu sahaja balasan yang diminta.. selamat berjaya

Sorry..tak boleh nak attach kan file sbb blogspot ni tak support file words :):)...so, saya copy paste jer soalan dan jawapan tersebut, harap tuan/puan boleh print out jer pages blogspot ni heheeeee...

IEM PI CoE Q&A (Some answer points)

Q 1 Dilemma between capital expenditure and optimum design.
Ans:    Is it really a dilemma
            Technology comes with cost
Reduction of scope of work
Simple design
Offer what the client wants and can afford.
            Stick to the best quality materials at the best rates.
            Clarify all impact and implications to clients
            Be reminded of safety; low maintenance and optimum life-cycle cost.

Q 2 Benefits of privatization.
Ans:    Examples of privatized public utility companies in Malaysia.
            Case studies of Power and Water companies.
Be clear about the differences between BOT, concession and other forms of business by the government to the public.
Stability of supply / lower down-time / better quality services
Faster decision-making process – faster response
Focus on possible benefits on Training, bigger financial base, introduction of up-to-date technology, transfer of technology, international exposure and scope.
Consider counter-benefits of higher fees

Q 3 Safety practices in selected industries.
Ans:    Pick one industry of your choice.
Be careful in assessing the adequacy of the safety practices. It should be adequate but certain aspects still need to be addressed.
Safety policy
Personal Protective Equipment
Include safety costs in quotes
Look at issues on awareness, implementation and enforcement.
Look at Hazop and Hazan; Safety audits; job safety analysis, contractors scope,
Fixed installations – passive protection
PPE; hardware and software of safety and fire-fighting.

Q 4 IEM and promotion of professionalism.
Ans:    Know well the current organization, roles, functions, activities and influence of IEM and suggest areas of improvement towards promoting professionalism of engineers.
            Areas may include:
                        Consultants to government / single voice on national issues
                        Public awareness of the profession / what we do, what we can provide
                        Interaction and cooperation between professions
                        Regulatory body on ethics and professional conduct
                        Reference for technical matters

                       
                       

Q 5 Positive impacts on contributions of engineers.
Ans:    Focus on big impacts and not the ordinary.
            Pick up maybe one extraordinary example from each common discipline of engineering and elaborate how each has contributed immensely to the well-being of mankind.
            Protection of the environment; combating poverty and disease; design of super-efficient systems, educational facilities, IT infrastructure etc.

Q 6 Self-promotion of engineers without using commission and anything similar to get jobs.
Ans:    Examine issues on advertising for services.
            Progress step-by-step:
                        Good self-projection              
Participate in lectures
                        Do R&D and publish
                        Promote through exhibitions
                        Lead and perform by showing good examples
                        Establish through design competition and the like

Q 7 Steps to prevent corruption and unethical practices.
Ans:    Practise good set of procedures
Abide to laws, rules and regulations
Be transparent, use open tender, subject work to audit, use of standard specs, competitive bidding for supplies, fair evaluation, no deviations of specs or alternative offer, QA/QC, pay employees well.

Q 8 Ethical considerations of a rushed land clearing job.
Ans:    Job behind time with conflict between environmental requirements and pressure to finish the job in time; temptation to:
Sub-standard work, by-passing procedures, inducement to inspectors, over-time and unsafe and night work. Consider to reschedule in order to put in place preventive measures.

Q 9 Better quality construction without conflict to profits.
Ans:    Redefine scope
Prepare better set of specs
Choose better materials, manpower, techniques, machinery, etc at better rates.
Maintain good QC/QA
            Good relationships between all stakeholders.

Q 10 Solving conflict of professional interest.
Ans:    Conflicts could be economic, environmental, management touching on issues related to:
Cost recovery after a ‘dive’ in quotation
Effluents and emissions
‘Wistle-blowing’
Marginal quality
Unsafe practices

Issues on undercutting, backdoor methods, taking more risks as a result.
Be clear on objectives: on specs and on time with required quality. Listen to all parties, good team-work, shared responsibility, third party involvement on fees management, merging of consultants.

Q 11 Consequences of observing laws and regulations on all kinds of pollution.
Ans:    Pick up an industry: discuss needs of regulations; examine consequences positive as well as negative; good to the environment, higher investment and higher cost of operation.

Q 12 Cost effectiveness and HSE requirements.
Ans:    Involve design; cost reduction to achieve higher productivity; better health, safety and environmental considerations in the long run will be cost-effective.

Q 13 How engineers can keep abreast with development of technology.
Ans:    Discuss benefits of bearing in mind HSE issues in an engineer’s work. Discuss aspects of CPD to update the knowledge and competency of engineers.

Q 14 Request of irregular proposals from a turn-key contractor.
Ans:    Examine the pros and cons of a turnkey contract vis-a-vis the position of the engineer. Give examples of possible requests in question and what could be done by referring to codes and standards.

Q 15 Issues on virtual labs.

Ans:    Discuss the real benefits of having real labs for various engineering disciplines. See if the objectives can be achieved by alternative means including virtual labs. Examine the cost, convenience and effectiveness impacts. Elaborate areas where the virtual labs are better.


Sunday, March 8, 2015

Boleh Hubungi saya di alamat email....

Salam,

saya boleh dihubungi dialamat email suhaimideris@gmail.com. Tuan/puan boleh bertanya saya mengenai profesional engineer dan juga yang ingin memerlukan khidmat consultation pasal bilik bedah di Hospital. Kalau nak bertanya pasal standard/procedure dan kaedah design bilik bedah atau apa2 sahaja yang berkaitan dengan Airconditioning & Ventilation System takder masalah..emailkan pertanyaan tuan/puan. Insyallah saya akan reply email tersebut. Kalau ada masalah bakteria atau test air sampling yang fail dan lebih dari 35CFU pon bleh email kat saya. Insyallah saya akan bantu.

Pada masa ini dah bnyak hospital yang telah saya buat testing dan boleh dikatakan kebanyakannya gagal memenuhi standard dan piawaian antarabangsa. Biasanya saya akan buat CPT test dahulu dan diikuti dengan membuat siasatan dan laporan appraisal akan dibuat dan dihantar pada pihak client. Pada masa ni saya tengah buat projek bilik bedah di Hospital kemaman. Hospital ni antara yang pertama saya design sistem AHU dengan mneggunakan innovative design dengan menggunakan double coil refrigerant system. Kebaikkan sistem ini ia dapat mengekalkan humiditi dan suhu bilik pada takat yg diperlukan wpun chiller water system hanya masuk pada 7 atau 8°C sahaja. Sistem ini juga saya gunakan sebagai rig eksperimen untk research PhD saya di UTM Skudai. Insyallah hjung tahun ni siaplah. anyway boleh hubungi saya di alamat emel diatas jika memerlukan apa2 pandangan,.dan pandagan tersbut adalah PERCUMA kecuali bila dah buat keja sahaja kejan caj heheeeeeee....adiosss..

Monday, July 5, 2010

Berita Terbaik

Salam, entah ada org baca ke blog yang aku buat ni..heee, kalau ada ok la., kalau takder sesungguhnya blog ini memberikan kenangan kepada apa yang kita ingin luahkan.

Seperti yang aku sharekan dekat FB.. 'Berita dari BEM..sijil Profesional Engineer (Ir) aku akan kua minggu depan'...heee ini bermakna dalam minggu ni lah. saja ingin kongsi kan perit penat,lelah menunggu dan mngusahasakan bg mendapatkan sekeping sijil yg amat bermakna bagi org yg berkarier dan minat seperti aku ini. seperti yg aku tulis sebelum ini bahwa aku dah lepas exam dan lulus dengan cemerlang ujian bg mendapatkan PE, agak2 dalam bulan 12 tahun lalu memang benar, tetapi aku tidak mengetahui bahwa proses utk mendapatkan sijil PE ini cukup sukar, hmm selama 6 bulan aku mennunggu dan terpaksa berkejaran ke BEM bg memnuhi segala dokumen yg diperlukan. Antara masalah yg timbul selepas bln 12 tahun lepas ialah aku tidak cukup mata CPD wajib dan juga CPD extra yg diperlukan. AKu agak2 sebnayak 50jam credit yg diperlukan..dan sblm itu aku hanya ada 16jam sahaja.

Bnayak la kursus2 yg telah aku hadiri, seminar2 dan juga meeting yg diluar dalam bidang aku pun kena pergi jugak. itu adalah satu syarat yg dikenakan agar kesemua PE ini tidak tertakluk pada kerja masing2 sahaja. itu sbb amik masa yg agak lama utk memenuhi kesemua jam kredit tersebut...dan lagi pun pada awal tahun 2010 kerja2,projek kat ofis terlalu banyak nak disetelkan. Tapi semua itu dah berlalu, aku bersyukur pada kehadrat Ilahi penantian dan usaha selama 6 tahun berbaloi..insyAllah pg besok aku akan call BEM nak tanya sijil dah bleh collect ke blum..heeee

Arah tuju...?? - Entah la..ramai kekawan yg suruh bukan consultant, aku tahu aku mampu dan berkebolehan sbb itu bidang aku...tetapi masa yg amat krtikal..hmmm sapa nak jaga dan run comp konsultan aku ini?? kalau dibiarkan sahaja baik takayah bukak...hmmm nantilah aku pkir-pikirkan dengan sedalamnya...lagi pun kalau nak bkk compnay consultant ni baik kena bkk syarikat Sdn Bhd terus...amik mekanikal dan elektrical...tetapi aku kena ada patner Ir Elektrical sorang...hmmm kalau sapa2 yg ada PE elektrical bleh la contact saya, jom kita jadi bisnes patner dan bkk company...insyAllah rezki sentiasa ada JIKA hanya kita berusaha...

Apa pun, aku hnaya hendak menikmatinya terlebih dahulu sblm membuat apa2 keputusan... samapi berjumpa lagi di lain masa..heeee, dah dapt sijil aku upload kat blog ni...sekian..

Design of Isolation room in Hospital

Salam guys, ni tutorial utk design isolation room dalamm hospital...